High speed internet has been installed in the Church office, and the email address has changed accordingly.
The props for the Last Supper are to be discarded. They have been stored for at least fifteen years, and have suffered some damage over this period. It is unlikely that they would be useable without a lot of repair.
The exposed structural steel of the bell tower was painted over the summer, and all tile floors were stripped and waxed. The water inlet pipe was changed from 1” to 3/4” and the lower capacity meter was installed. Intermediate balusters can be installed on stair railings to bring them up to code (less than 4 inches between balusters).
Eighty-one people aged 16 to 76 slept in the hall when the Bible Society bike tour stopped here on August 28.
We have received almost $4,000 from three insurance policies donated by Danford Smith several years ago. We topped it up to an even $4,000 and used it to pay down the mortgage by this amount.
Dave Chapman
Monday, December 11, 2006
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment